
Location: Northolt Underground Station, West London
Delivery period: 3 days
Service: Silviculture / Landscape Reinstatement
Project: Northolt Station Step-Free Access Improvements
Euroforest was appointed to undertake landscape reinstatement and planting works along the south-side embankment at Northolt Underground Station, following construction works associated with the station's new steel access structure.
The wider Transport for London (TfL) project involved the installation of a new footbridge and lift to provide step-free access to the station's island platform. With the station remaining operational throughout the wider construction programme, reinstating the surrounding landscape required careful planning and coordination within a restricted railway environment.
Euroforest's works focused on restoring the disturbed embankment through a programme of mixed tree and shrub planting, helping to re-establish a continuous planted landscape alongside the station.
The project involved installing 271 smaller trees and shrubs, alongside 13 larger Sorbus aucuparia (rowan) trees, with protective measures introduced to support the establishment of the new planting.
Working alongside an operational Underground railway presented several logistical and practical challenges that required careful planning throughout the three-day programme.
The narrow embankment and limited access route created challenges for moving materials, equipment and planting stock into position. This required a carefully managed approach to material handling and predominantly hand-led operations.
The work area was immediately adjacent to the Central line, meaning all activities had to be carefully coordinated around the railway environment. Controlled movement of materials, clear sequencing and adherence to site safety requirements were essential throughout.
The larger container-grown trees required suitable soil depth, carefully prepared planting pits and secure support to ensure they were correctly installed within the embankment.
With the reinstatement scheduled across just three working days, the team needed to coordinate the different stages of planting efficiently, from initial setting out and excavation through to installation, protection and finishing works.
Euroforest adopted a phased delivery approach, carefully sequencing the planting activities to make the best use of the restricted access and available working space.
Planting positions were established before excavation began, allowing the team to organise the work area and manage the movement of materials effectively.
The larger container-grown rowan trees were installed first, with appropriate staking and tying to provide support. The team then progressed with the smaller native tree and shrub stock, followed by the installation of protective guards to help protect the new planting.
The work was delivered over three consecutive days:
Daily photographic records were maintained throughout the operation, documenting progress from the initial prepared embankment through to completed reinstatement.
Euroforest successfully completed the embankment planting and landscape reinstatement within the planned three-day programme.
The completed works re-established a continuous planted landscape alongside Northolt Underground Station, incorporating a mixture of smaller trees and shrubs with larger established tree stock.
Key project outcomes included:
The completed planting provides a reinstated landscape following the wider station construction works, with protection measures in place to support the establishment of the new trees and shrubs.
The Northolt Station project demonstrates Euroforest's ability to deliver specialist planting and landscape reinstatement works within complex infrastructure environments.
Through careful planning, controlled material handling and effective sequencing, our team completed the works safely and efficiently within a demanding three-day programme.
The project highlights the importance of adapting working methods to suit individual site requirements, particularly when operating within restricted spaces and alongside critical infrastructure.
By combining practical planting expertise with a coordinated approach to delivery, Euroforest helped restore the station embankment and complete an important element of the wider infrastructure improvement project.


